img

C31 TRAFFIC CONTROL WITH LAW & BUSINESS

$299

Go To Order Page


C31 - A construction zone traffic control contractor prepares or removes lane closures, flagging, or traffic diversions, utilizing portable devices, such as cones, delineators, barricades, sign stands, flashing beacons, flashing arrow trailers, and changeable message signs, on roadways, including, but not limited to, public streets, highways, or any public conveyance.

The following are KIT OPTIONS;

$299 - Trade Manualsplus Law & Business Manual, access to our Online Exam Preparation, NO Guarantees or Lectures on DVDs or CDs.

$349 - Trade Manual plus Law & Business Manual, access to our Online Exam Preparation, 200% Guarantee, and Lectures on CDs.

$399 - Trade Manual plus Law & Business Manual, access to our Online Exam Preparation, 200% Guarantee, and Lectures on DVDs.

$449 - Trade Manual plus Law & Business Manual, access to our Online Exam Preparation, 200% Guarantee, and Lectures on DVD & CDs.

BENEFITS AND FEATURES

Easy to Use Home Study Courses FREE Updated Practice Exam Questions
Study at your time, at your own Pace BONUS Online Practice Exam Center
Live Contractors Licensing Support 200% PASS or Money Back Guarantee
FREE State Application Reviews Includes Required State Documents
Courses Instructors on DVDs & CDs FREE Shipping for NEW License KITS
Study Manuals for each Trade Everything needed to get your license
Sample Exam Questions with Answers 98% PASS the State Exam the first time
Answers include Helpful Explanations We’ve Licensed over 50,000 Contractors

These NEW CONTRACTOR KITs include both the "Contractors Trade Course" and the "Law and Business Course" required to get your California State License. KITs include the Study Manuals with the lectures available on DVD, CD, or Both. KITs also include a Licensing Checklist, the Applications, and Hundreds of Practice Exam Questions with answers and explanations. You will also get access to our Online Exam Preparation Center from which you can test yourself repeatedly right up to the day of your State Exam. In addition, we will assist you and review your Application before you send it to the State. KITs may very base on the Lecture DVDs, CDs, Assistance, and Guarantee.

TABLE OF CONTENTS
 

  • Construction Zone Traffic Control Contractor
  • Construction Zone Traffic Control Contractor Exam Overview
  • Math
  • English vs. Metric Units
  • Temporary Traffic Control Elements
  • Channelizers and Barricades
  • Sign Installation
  • Portable Changeable Message Signs (PCMS)
  • Flashing Arrow Signs (FAS)
  • Pavement Markings
  • Crash Cushions
  • Flagging

1. 205 traffic cones are required for a lane closure. The cost of renting cones is $.52 each day. What would be the rental cost for 8 days?
a. $106.60
b. $800.00
c. $852.80 *
d. $10,660.00

2. The California Manual on Uniform Traffic Control Devices handles traffic safety for which of the following?
a. All roads in California
b. All interstate freeways
c. All California public works projects
d. All areas the driving public has access to in California *

3. A pilot vehicle is being used on a traffic control project. Bicyclists need to get through the closure. What is the BEST option for the C-31 contractor?
a. Let all of the bicyclists go ahead of traffic
b. Make the bicyclists find an alternate route
c. Allow the bicyclists to proceed at their own risk without escort, as long as they go against traffic to increase their visibility
d. It depends on the conditions and discussions with the inspector and prime contractor *