img

C16 FIRE PROTECTION, TRADE ONLY

$199

Go To Order Page


C16 - A Fire protection contractor lays out, fabricates, and installs all types of fire protection systems; including all the equipment associated with these systems, excluding electrical alarm systems.

The following are KIT OPTIONS; 

$199 - Trade Manual, access to our Online Exam Preparation, NO Assistance, NO Guarantee, and NO Lectures on DVDs or CDs.

$229 - Trade Manual, access to our Online Exam Preparation, Application Assistance, 200% Guarantee, and Lectures on CDs.

$259 - Trade Manual, access to our Online Exam Preparation, Application Assistance, 200% Guarantee, and Lectures on DVDs.

$289 - Trade Manual, access to our Online Exam Preparation, Application Assistance, 200% Guarantee, and Lectures on DVDs and CDs.

BENEFITS AND FEATURES

Easy to Use Home Study Courses FREE Updated Practice Exam Questions
Study at your time, at your own Pace BONUS Online Practice Exam Center
Live Contractors Licensing Support 200% PASS or Money Back Guarantee
FREE State Application Reviews Includes Required State Documents
Courses Instructors on DVDs & CDs FREE Shipping for NEW License KITS
Study Manuals for each Trade Everything needed to get your license
Sample Exam Questions with Answers 98% PASS the State Exam the first time
Answers include Helpful Explanations We’ve Licensed over 50,000 Contractors

These ADD CONTRACTOR CLASSIFICATION KITs include the "Contractors Trade Course" required to add an additional California State License Classification to your existing license. KITs include the Study Manual with the lectures available on DVD, CD, or Both. KITs also include a Licensing Checklist, the Applications, and Hundreds of Practice Exam Questions with answers and explanations. You will also get access to our Online Exam Preparation Center from which you can test yourself repeatedly right up to the day of your State Exam. In addition, we will assist you and review your Application before you send it to the State. KITs may very base on the Lecture DVDs, CDs, Assistance, and Guarantee.

TABLE OF CONTENTS

 

  • Fire Protection Contractor
  • Fire Protection Contractor's Exam
  • Measurement
  • Properties of Water
  • Math
  • Plan Symbols
  • Types of Sprinkler Systems
  • NFPA 13
  • NFPA 14
  • NFPA 24
  • Hydraulics
  • Health and Safety Orders

1. What events are required to activate a preaction double interlock electric pneumatic system?
a. Operation of a water flow device and drop in air pressure
b. Operation of a control valve and sprinkler head
c. Operation of a fire pull station and control valve
d. Operation of detection device and sprinkler head *

2. When should a contractor perform an underground flush test?
a. Prior to connection to the supply source, and prior to connection to the system riser
b. Prior to connection to the supply source, and after connection to the system riser
c. After connection to the supply source, and prior to connection to the system riser *
d. After connection to the supply source, and after connection to the system riser

3. According to NFPA 25, how long after installation should quick-response sprinklers be tested?
a. After 5 years
b. After 10 years
c. After 20 years *
d. After 50 years