img

C04 BOILER HEATING WITH LAW & BUSINESS

$300

Go To Order Page


C04 - A boiler, hot-water heating and steam fitting contractor installs, services and repairs power boiler installations, hot-water heating systems and steam fitting, including fire-tube and water-tube steel power boilers and hot-water heating low pressure boilers,steam fitting and piping, fittings, valves, gauges, pumps, radiators, convectors, fuel oil tanks, fuel oil lines, chimneys, flues, heat insulation and all other equipment, including solar heating equipment, associated with these systems.

The following are KIT OPTIONS;

$299 - Trade Manualsplus Law & Business Manual, access to our Online Exam Preparation, NO Guarantees or Lectures on DVDs or CDs.

$349 - Trade Manual plus Law & Business Manual, access to our Online Exam Preparation, 200% Guarantee, and Lectures on CDs.

$399 - Trade Manual plus Law & Business Manual, access to our Online Exam Preparation, 200% Guarantee, and Lectures on DVDs.

$449 - Trade Manual plus Law & Business Manual, access to our Online Exam Preparation, 200% Guarantee, and Lectures on DVD & CDs.

BENEFITS AND FEATURES

Easy to Use Home Study Courses FREE Updated Practice Exam Questions
Study at your time, at your own Pace BONUS Online Practice Exam Center
Live Contractors Licensing Support 200% PASS or Money Back Guarantee
FREE State Application Reviews Includes Required State Documents
Courses Instructors on DVDs & CDs FREE Shipping for NEW License KITS
Study Manuals for each Trade Everything needed to get your license
Sample Exam Questions with Answers 98% PASS the State Exam the first time
Answers include Helpful Explanations We’ve Licensed over 50,000 Contractors

These NEW CONTRACTOR KITs include both the "Contractors Trade Course" and the "Law and Business Course" required to get your California State License. KITs include the Study Manuals with the lectures available on DVD, CD, or Both. KITs also include a Licensing Checklist, the Applications, and Hundreds of Practice Exam Questions with answers and explanations. You will also get access to our Online Exam Preparation Center from which you can test yourself repeatedly right up to the day of your State Exam. In addition, we will assist you and review your Application before you send it to the State. KITs may very base on the Lecture DVDs, CDs, Assistance, and Guarantee.

TABLE OF CONTENTS

 

  • Boiler Hot Water Heating Contractor Overview
  • Measurement
  • Math
  • Abbreviations and Definitions
  • Symbols and Stamps
  • Boilers Definitions
  • Boiler Systems
  • Construction of Boilers
  • Boiler Accessories
  • Boilers General Practices
  • Auxiliary Steam Plant Equipment
  • Boiler Water Treatment
  • Illustrations
  • Piping Systems Hartford Loop
  • Piping Systems Holly Loop
  • Calculating Linear Expansion
  • Safety Valves
  • Welding
  • Weld Tests
  • Health and Safety Orders

1. Which of the following conditions would probably cause foaming?

a. Turbulence in the water
b. Sludge or sediment in the check valve
c. A high concentration of liquids in the boiler chamber
d. A high concentration of solids in the boiler water #

2. What does the boiler aquastat control?

a. Water pressure
b. Gas pressure
c. Room temperature #
d. Water temperature

3. If the required boiler capacity to meet the demand for heat is 100,000 btus at a 20 degree Delta T, what would be the trunk main required gallons per minute?

a. 2 gpm
b. 4 gpm
c. 8 gpm #
d. 10 gpm